Showing posts with label bathrooms. Show all posts
Showing posts with label bathrooms. Show all posts

Views from Inside

Well, the camera has been doing overtime! While it does feel a little weird taking photos of what is now our home - rather than a work in progress - here are some shots of inside.


As an unconfident sewer, I have to point out the homemade turquoise velvet cushion - one of four I'm proud to say! The fabric was bought on a whim on a visit to Auckland last hols and it perfectly matches, as I had hoped, the rug.


Entrance to the living space and kitchen, capturing the view of the trees.


View from the deck through to the kitchen and dining space - plus an amazing floral creation of sunflowers and cabbages a friend made for me.


Kitchen/living wall niche painted in Resene Triple Masala.


The bathroom off the living room.


The wallpaper is from Laura Ashley if anyone's interested, bought on sale at an amazing $48 a roll which is a bargain in wallpaper-world!


Front door and stairwell detail. Finally the glass balustrades are in and are the correct measurements!


Am loving the sandstone wall but it does seem to attract the huntsmen! Although we have had two in the dishwasher so maybe there's just something about the house. Whatever it is, I'll have to warn our English visitors who are arriving in two weeks!

Until next time ...
Jx

We're in #3: Wallpaper, family rooms & buildings sites

Am in love with wallpaper and am so glad we've used it here and there, as in the rumpus room toilet (just for my English hubby!) ...

The mirror on the floor will, of course, go above the vanity!


And the Triple Masala walls in the TV room have come up a treat ...



 I'm so happy we decided to keep some of the original bricks exposed in the rumpus room ...



But let's not forget it's still a building site! 

External study louvres showing the entrance 


... and the front garden

Over the next two weeks we're hoping to see a lot of progress so watch this space!

We're in #2: Bedrooms

As promised here are some more shots of the interior: the bedrooms ...

Our bedroom with the 'Tree Tops' wallpaper which has come up better than I expected.


Spare bedroom detail (the bed's not up yet as special screw thingys needed to lock the slats in place are missing - hopefully in a box yet to be unpacked in the garage. But, don't worry, English visitors - it will be up in time for your visit at Christmas!).


Daughter #1's purple bedroom


Detail in daughter #1's bedroom. The curtains have small silver sequins in the flower pattern which look gorgeous at night. 


Daughter #2's desk detail with its pale aqua colour scheme.

I have to say the girls have been fantastic at packing and unpacking their rooms. I've not done a thing! Well, the deal was if it doesn't get packed or unpacked then it's gone - in the rubbish or given away. Seemed to work!

Pale blue metallic tiles in the girls' shower (wish I'd put them around the bath now they look so pretty!)

I have more so will put them in the next post!

Four days to go!

I've been really slack with my blogging, I know, I'm sorry. And some of the tradies have been really slack on site, too! The painters have been sacked and replaced by a new team and the pool man has been fired for not turning up. The painting is only half done, there is no carpet, no wallpaper, no study joinery.

We move in on Thursday and this is what it looks like ...


The carpet is being laid on Wednesday and the stair balustrades are going in Thursday morning. Talk about tight! But at least the front door's in.


And we have an entrance.


We have kitchen benchtops, a gas hob and a new fence behind.


We have some lovely bathroom tiling.

Master bath


Girl's bathroom

We have a louvred privacy screen on the deck.


A partially formed barbecue area off the deck.


And a fence-less back yard which better be fenced when we move otherwise Ruby will be roaming!


And at least they're trying to look after the floors ...


No matter if the paint's still tacky I can't wait to move in!

P.S Tomorrow I'll show you two pendants I've just picked up which are yet to be hung ... Jx

Update: Two and a half weeks to go!

Okay, so things have been getting a bit stressful over at my place. The builders have been working towards us moving in on September 10 and so we decided to book the removalists for the 12th. But despite them going all out, there has still been quite a bit to do and we weren't sure they would get done. On top of that, once the inside is complete, the architect has to do a final 'defects check' (crikey!) before the inside is given the all-clear. Soooo, we've asked our agent if the landlord would mind terribly if we moved our move forward to the 16th. Haven't heard yet, but am crossing fingers!


In any case, the good news is that the concrete for the parking bay in front of the garage has been poured - after finally getting the go-ahead from the engineer that doing screw piles instead of deep-set piles (which are time-consuming, expensive and come with the risk of hitting goodness knows what boulders or pipes below). And to ensure access is guaranteed for the removalists, we'll wait until after we're in for the guys to lay the stone flagging.


The stone masons are doing an amazing job with all the stone. Here they are out the back. It's a bit hard to see properly but they're rebuilding the old rockery (to the left) using a mix of the old boulders and new and adding bigger and better steps from what will be lawn up to the BBQ area and onto the deck.


After a few false starts and some tiling mishaps (oops!), the bathroom tiling is well underway. The photos don't do it justice at all - the lighting or something not really working but they give you an idea. Above is the master ensuite - the back wall where the shower and toilet will go is  in small pearly white mosaics, and below is the guest ensuite with the same kind of mosaics but in gun metal.


I think the grouting will make a lot of difference!

That's all for now, folks. Have a great week!

Buidling Progress: Six weeks to go! (Are you kidding?)

I don't know who's kidding who but with only six weeks to go there's still a lot to do but there is progress ...


The bathrooms are ready to be tiled. Seen here: downstairs' bathroom - the bath will go along the back wall between the windows, the vanity under the recess, the toilet where the large pipe is coming out of the wall.



The walls are ready to be painted. Seen here: guest bedroom with the hole for the niche shelving above the bed and the wardrobe behind.



The bathroom appliances are being delivered in time for their placement. Seen here: the place where the master bath will go - just in case there is any confusion!



The entry is coming along.


The garage was coming along until it turned into a storage room.


The laundry is well ... a boy's loo!


And this: the view from up the path outside the property.

Fancying ...


Image via The House that A-M Built via House and Garden

Summer and lazy days by a pool


An ergonomic desk chair


This shower (but no close neighbours nearby!)


Chocolate cake ... mmm, yum

What are you fancying right now?

Older Posts Home

Related Posts Plugin for WordPress, Blogger...

Popular Posts


TopOfBlogs My Zimbio
Feedage Grade A rated
Preview on Feedage: house-interior-design-luxury Add to My Yahoo! Add to Google! Add to AOL! Add to MSN
Subscribe in NewsGator Online Add to Netvibes Subscribe in Pakeflakes Subscribe in Bloglines Add to Alesti RSS Reader
Add to Feedage.com Groups Add to Windows Live iPing-it Add to Feedage RSS Alerts Add To Fwicki
Add to Spoken to You
coupons

Blogger Template by Blogcrowds